Rs 500 crore for road development works in Bangalore

Bruhat Bangalore Mahanagara Palike:

  1. Development of arterial, sub-arterial roads to be taken up at Rs. 500 crore
  2. Widening of important roads as per Master Plan 2015 at Rs. 300 crore
  3. Construction of RUB/ROB in collaboration with railways at Rs. 200 crore
  4. Development of 12 main roads under TenderSure at Rs. 300 crore
  5. Development of backward areas under erstwhile CMCs, TMC within BBMP at Rs. 250 crore
  6. Construction of grade separators at important junctions at Rs. 200 crore
Bangalore Development Authority:
  1. Construction of Peripheral Ring Road at Rs. 5,800 crore with JICA assistance
  2. Construction of underpass at Goreguntepalya at Rs. 125 crore under JNNURM
  3. Elevated corridor from ALISDA, near Jalahalli, to BEL Circle at Rs. 191.86 crore under JNNURM
  4. Elevated corridor from Basaveshwara Circle to Hebbal junction at Rs. 1,100 crore
Bangalore Water Supply and Sewerage Board:

  1. Detailed project report to be prepared for providing water supply to 110 villages in BBMP area
  2. 74 km sewer lines to be strengthened in 2014-15 with 50 per cent funding from KUIDFC
  3. Existing 180 MLD waste water treatment plant to be up upgraded to 300 MLD
  4. 108 waste water treatment plants of one to two MLD to be set up during 2014-15